The International Concrete Repair Institute (ICRI) revised and updated technical guidelines No. 310.2R-2013, “Selecting and Specifying Concrete Surface Preparation for Sealers, Coatings, Polymer Overlays, and Concrete Repair” in 2013 and yet many architects and

resinous flooring experts have still not modernized their practices.

These guidelines outline what equipment is needed to achieve each concrete surface profile (CSP) grade and the correct CSP for the protective flooring system chosen.

This is very helpful for an installer as flooring product manufacturers specify the type and quality of the surface preparation that is required to ensure the success of their product.

While it would be difficult, if not impossible, to explain all of the various techniques used to perform a complete survey of existing conditions this blog post will explain the basic criteria that are assessed.

So how do these guidelines aid the selection of the proper concrete surface preparation method that adheres to the manufacturer’s specifications? One of the best tools provided is a checklist for assisting in specifying surface preparation, including:

  1. Evaluation of:

Substrate condition

Material to be installed

Job-site conditions

  1. Review of surface preparation method(s)
  2. Selection of surface preparation method(s)

4.Surface preparation requirements

Profile (CSP)

QC testing criteria.

Before you even start evaluating the condition of the substrate you will want to consult with the manufacturer’s specifications to determine what special properties or characteristics the flooring system material may have.

The next step is determining the condition of the substrate. You will want to evaluate the substrate for qualities such as strength, deterioration, existing coatings, and many other factors to help determine the type and amount of surface preparation needed.

The ICRI provides a checklist for a thorough substrate evaluation to help visualize the general to specific qualities to assess.

Substrate Conditions Evaluation Checklist

  • Surface Conditions

Efflorescence, Encrustations, Solid

Surface Imperfections

Previous Patches

Bond Breaking Contaminants

  • Soundness

Delaminated concrete depth

Cause of deterioration

Pull-off tests

Chloride content and penetration depth

Carbonation depth and pH

  • Hazardous Materials

PCB

Frangible Asbestos

Chemicals

Lead

Heavy Metals

  • Finish

Formed Wood Float

Metal Trowel

Power Trowel

Broom Finish

Sacking

Storing

Block

Shotcrete

  • Moisture

Concrete Maturity (Fresh/Green Concrete)

Hydrostatic Pressure

Substrate Moisture

Vapor Barrier Present

No Vapor Barrier

Drainage

  • Joints and Cracking

Cold Joints

Construction Joints

Expansion

Dynamic

Static

Crazing

Leaking

  • General Observation

Permeability (inhibit penetration)

Section thickness

Required depth of removal

There is no way to select the surface preparation method without first knowing the properties and application requirements of the flooring system to be installed. The repair material and/or flooring system will strongly influence the surface profile and surface preparation needed.

Speaking generally, the protective system and repair material should be analyzed by its substrate strength, profile, application thickness, moisture tolerance, and alkali tolerance. Again there is a checklist provided for a thorough substrate evaluation.

Material Requirements Evaluation Checklist

  • Substrate Strength

Tensile Bond Strength

  • Profile

Sealers 0-3 mils (0-0.075 mm) CSP 1-2

Thin Film Coatings 4-10 mils (0.01-0.25 mm) CSP 1-3

High Build Coatings 10-40 mils (0.025-1.0 mm) CSP 3-5

Self-Leveling 50 mils-1/8 inch (1.2-3.0 mm) CSP 4-6

Polymer Overlays 1/8-1/4 inch (3-6 mm) CSP 5-9

Concrete overlays, toppings and repairs >1/4 inch (>6 mm) CSP 5-10

  • Other

Application Thickness

Moisture Tolerance

Cleanliness (dust)

The most difficult and lengthy factor to evaluate is the job-site conditions as there are so many variables to assess such as noise, vibration, dust, and water.

There are also many concerns the facility owner may raise such as uninterrupted use of the facility, concerns about the operating environment, or property damage potential may limit the choice of surface preparation method.

The areas of concern can be broken down into three main categories: Accessibility, environmental considerations, and mechanical data – utility supply (type, availability, access location, and cost). All concerns can be seen on the checklist below.

Jobsite Conditions Evaluation Checklist

-Accessibility

Physical Conditions

Surface Orientation

Obstacles

Exposure

  • Environmental Considerations

Recycling/Disposal

Airborne (i.e. abrasive blasting)

Liquid (i.e. hydrodemolition water)

Solid (i.e. shot blasting)

Debris (i.e. concrete)

Hazardous Waste (i.e. existing coatings)

Containment

Temperature Conditions

  • Mechanical Data – Utility Supply (type, availability, access location, and cost)

Electricity

Compressed Air

Ventilation

Water

Sanitary Facilities

Fuel

Performing a methodical, thoughtful system of evaluation, review, selection, and specification, the proper surface preparation method(s) can accurately and efficiently selected and verified.

While it is not possible to completely outline every step and consideration for undertaking a survey of existing conditions of a project, the guidelines, checklists, and charts provided in the “ICRI technical guidelines: Appendix B” is a great starting point and will greatly enhance the odds of a successful project.

Remember that there is no substitute for an experienced, knowledgeable resinous flooring expert. Armed with your evaluation and selected criteria the next step is to identify the method, or combination of methods, most likely to produce the desired results for the project.